posted Wed Sep 16 08:23:33 1998 PDT
| Date of Mission: | 30 August, 1998 |
| Daily Mission Scientist: | Ed Zipser |
| Deputy Daily Mission Scientist: | Gerry Heymsfield |
| DC-8 Scientist: | Ed Zipser |
| S-POL Scientist: | Gerry Heymsfield |
| Project Scientist: | Robbie Hood |
| UND Citation II Scientist: | Jeff Stith |
| Water Vapor Scientist: | Harvey Melfi |
| Nowcasters: | Ed Bensman |
| ER2 Tail Number: | NASA 806 |
| Sortie: | 98-113 |
| Pilot: | Ken Broda |
| Take Off: | 1940 UTC (98/08/30) |
| Landing: | 2324 UTC (98/08/30) |
| Duration: | 3.73 hrs |
| DC8 Tail Number: | NASA 817 |
| Sortie: | 980413 |
| Pilot: | Frank Batease Ed Lewis |
| Mission Manager: | Chris Miller |
| Navigator: | Trout |
| Take Off: | 1949 UTC (98/08/30) |
| Landing: | 0336 UTC (98/08/30) |
| Duration: | 7.78 hrs |
- Begin by documentation of storm structure in Danielle through execution of two figure-fours to 100 nm radius at 35000 ft. Coordinate closely with ER-2, more loosely with the NOAA P-3 (NOAA 43) doing the 100 nm radius pattern, and still more loosely with NOAA 42 operating along six radials of 300 nm each.
- Major objective of mission follows the figure 4's: an 11-pointed sawtooth pattern crossing the (formerly!) clear "inflow" area from the northeast quadrant, through southeast, and around to the southwest side.
- After completion of (1) and (2) above, the DC-8 leaves the pattern close to Andros Island, does a leg along and just east of Andros, coordinated with the ER-2.
All DC-8 objectives were satisfied. The early departure of the ER-2 and the need to turn off E-DOP was a disappointment, as there was no EDOP data over Danielle, and of course the ER-2 did not go to Andros.
Danielle gradually developed a better-organized inner core structure at DC-8 altitude. Even on the first pass (W-E), there was a circular radar eye (DC-8 radar) of about 40 nm diameter and some noticeable updrafts in the west wall cloud on entry. Throughout the two figure-four patterns, the best convection appeared on the west semicircle, sometimes with light-moderate turbulence. No lightning was observed in the eyewall, although some was later observed in the "clear slot" on the SE side at large radius from more isolated storms. The wind eye was fairly well- marked by 30-40 knot winds at radii of 25-30 nm.
The large sawtooth pattern encountered more clouds than had been anticipated; during the 8-9 hours that elapsed since mission planning the clear area on the east and south sides had filled in considerably. (This could have ben flown first, had not the Andros overpass been scheduled for after dark, which constrained the flight planning for the main mission.) Despite the cloud increase, most of the pattern obtained good data, especially at 19000 ft on the NE side, and at 21000 ft on the south side. The Andros overpass was made as scheduled, but I do not know whether the cloud conditions were considered suitable.
Back to the CAMEX-3 Flight Summaries Menu Page
Back to the CAMEX-3 Updates Home Page
Back to the CAMEX-3-A Mission Home Page
Back to the ESPO Missions Home Page
Back to the ARC Earth Science Division Home Page
Back to the NASA/ARC Home Page